Mason

What we’re learning 01 / 06

Existing equipment doesn’t serve every material movement. Mason goes after the ones it doesn’t.

Materials can be unloaded, stored, staged and delivered before anyone uses them. Every extra move costs time and labour.

Materials can arrive on site while the installation crew still can’t work.

The first place a material is put isn’t always where it’s used. It can be moved again, and again.

Material handlers often act as human dispatch systems, deciding what goes where, and when.

Long or awkward loads can need a second worker to steady them. And on a site, delays are all connected.

Loading Mason0%

Currently in

Mason moves materials so workers don’t have to.

An autonomous robot that carries bricks, blocks and rubble around the job site, so your crew can keep building.

Contact sales

Mason is in development.

Drag to rotate

Early interest from

Under the hood

What’s inside.

Drag to rotate, click a part

Loading the 3D model

    Built by engineers from

    • Larsen & Toubro
    • Systra
    • CSIR-CRRI
    • Lam Research
    • Jouleless
    • Ninjacart
    • Urban Company
    • Capillary Technologies
    • Shaadi.com (People Interactive)
    • Venture Catalysts
    • BITS Pilani

    Why Mason

    Move it once,
    to where it’s needed.

    On a construction site, materials can be unloaded, stored, staged and then delivered before anyone uses them. Every extra move costs time and labour.

    01

    Fewer moves

    Mason carries materials from storage straight to the work area, so there are fewer stops in between.

    02

    The hauls other equipment misses

    Forklifts, telehandlers and carts suit some jobs. Mason is for the short, repeated hauls where they’re a poor fit.

    03

    There when the crew is ready

    Materials staged early often get moved again. Mason brings them to the point of use when the crew needs them.

    On the job

    See a run.

    Storage to the work area, loaded. A sample run with sample data, not a live feed.

    Unit 01 Recording 00:00 Sample run 11:42:30

    Site map

    Stereo camera

    Speed

    0.0km/h

    030

    Load

    0kg

    01,500

    Events

      Ground roughness

      0.00 g rms

      Accelerometer, last 60 s

      Contact sales

      Put Mason
      on your site.

      We’re working with a small group of contractors first. Tell us about your sites and we’ll be in touch.